/h~5000t /h The term and final document of bridge grab ship unloader (hereinafter referred to as ship unloader) stipulates the definition of rated production rate of 400t, type classification and basic parameters, technical requirements, test methods, inspection rules, signs, Packaging, transportation and storage. This document is applicable to ship unloaders for unloading coal or ore. Ship unloaders with a production rate exceeding the above-mentioned ratings and ship unloaders for other bulk materials can also be used as a reference. This document does not apply to bridge-type grab ship unloaders installed on barges.
GB/T 26475-2021 Referenced Document
GB 50256 Code for construction and acceptance of electric device of crane electrical equipment installation engineering
GB/T 10183.1-2018 Cranes.Tolerances for wheels and travel and traversing tracks.Part 1:General
GB/T 10236 Guide for compatibility and protection of interference effects between semiconductor convertors and power supply system
GB/T 8923.1 Preparation of steel substrates before application of paints and related products.Visual assessment of surface cleanliness.Part 1:Rust grades and preparation grades of uncoated steel substrates and of steel substrates after overall removal of previous coa
GB/T 8923.2 Preparation of steel substrates before application of paints and related products.Visual assessment of surface cleanliness.Part 2:Preparation grades of previously coated steel substrates after localized removal of previous coatings