This standard specifies the terms and definitions, general provisions, acceptance of a complete set of equipment for waste heat recovery and utilization of sintering machines, acceptance of single machine trial operation, trial operation and acceptance of sub-systems, trial operation and acceptance of the complete set of startup equipment, and assessment of complete equipment. This standard is applicable to iron and steel enterprises that use ring or belt coolers and cooling sinter process waste heat with a cooling area of more than 100 m to perform power generation or heating equipment without supplementary combustion waste heat recovery and utilization technology. It is also applicable to newly built or similar equipment that requires similar Technically transformed sintering machine waste heat recovery and utilization complete set of equipment.
JB/T 11889-2014 Referenced Document
DL 5190.2 Construction Technical Specifications for Electric Power Construction Part 2: Boiler Units*, 2019-06-04 Update
DL 5190.3 Construction Technical Specifications for Electric Power Construction Part 3: Turbine Generator Sets*, 2019-06-04 Update
DL 5190.4 Construction Technical Specifications for Electric Power Construction Part 4: Thermal Instruments and Control Devices*, 2019-06-04 Update
DL 5190.5 Construction Technical Specifications for Electric Power Construction Part 5: Piping and Systems*, 2019-06-04 Update
DL 5190.6 Construction Technical Specifications for Electric Power Construction Part 6: Water Treatment and Hydrogen Production (Supply) Equipment and Systems*, 2019-06-04 Update
DL/T 5210.1 Regulations for acceptance of construction quality in electric power construction part 1: civil works
DL/T 5210.5 Electric power construction construction quality acceptance code part 5: welding*, 2018-12-25 Update
DL/T 5210.6 Electric power construction construction quality acceptance code part 6: adjustment test*, 2019-06-04 Update
DL/T 543 Acceptance Guidelines for Water Treatment Equipment in Thermal Power Plants*, 2023-10-11 Update
DL/T 5437 Thermal power generation construction project start-up trial operation and acceptance procedures*, 2022-11-04 Update
DL/T 805.4 Guideline for cycle chemistry in fossil plants.Part 4: feedwater treatment*, 2016-02-05 Update
GB 50049 Code for design of small fossil fired power plant
GB 50170 Construction and acceptance standards for rotating electrical machines in electrical installation engineering*, 2018-11-13 Update
GB 50171 Code for construction and acceptance of switchboard outfit complete cubicle and secondary circuit electric equipment installation engineering
GB 50242 Code for acceptance of construction quality of water supply drainage and heating works
GB 50243 Code for acceptance of construction quality of ventilation and air conditioning engineering*, 2016-10-25 Update
GB 50254 Code for construction and acceptance of low-voltage apparatus Electric equipment installation engineering
GB 50268 Code for construction and acceptance of water and sewerage pipeline works
GB 50300 Unified standard for constructional quality acceptance of building engineering
GB/T 12145 Quality criterion of water and steam for power plant and steam-generating equipment*, 2016-02-24 Update
GB/T 1576 Water quality for industrial boilers*, 2018-05-14 Update
JB/T 11381 Technical code of heat recovery equipments for sintering machine
JB/T 11382 Performance testing method of heat recovery equipments for sintering machine
JB/T 11889-2014 history
2014JB/T 11889-2014 Technical code for acceptance of waste heat recovery equipments for sintering machine