GB/T 22935-2008
Metal-halide lamps for projecting apparatus (English Version)

Standard No.
GB/T 22935-2008
Language
Chinese, Available in English version
Release Date
2008
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 22935-2008
Scope
This standard specifies the classification and naming, main dimensions, requirements, test methods, inspection rules, marking, packaging, transportation and storage of metal halide lamps for projectors. This standard applies to single-ended and double-ended metal halide lamps (hereinafter referred to as lamps) with a power of 150W. Metal halide lamps conforming to this standard and GB 19652 can be started and ignited normally within the range of 92%~106% of the rated power supply voltage when using ballasts, ignitors and lamps complying with the requirements of Appendix A and Appendix B .

GB/T 22935-2008 Referenced Document

  • GB 19510.10 Lamp controlgear-Part 10:Particular requirements for ballasts for discharge lamps(excluding fluorescent lamps)*2009-10-15 Update
  • GB 19510.2 Lamp controlgear-Part 2:Particular requirements for starting devices (other than glow starters)*2009-10-15 Update
  • GB 19652-2005 Discharge lamps(excluding fluorescent lamps)--Safety specifications
  • GB 7000.1 Luminaires - Part 1: General requirements and tests*2017-01-01 Update
  • GB/T 13434 Methods of measuring characteristics for discharge lamps(excluding fluorescent lamps)
  • GB/T 15042 Auxiliaries for lamps.Ballasts for discharge lamps(excluding tubular fluorescent lamps).Performance requirements
  • GB/T 18661 Metal-halide lamp(ScI3-NaI series)—Performance requirements*2020-07-21 Update
  • GB/T 191 Packaging.Pictorial marking for handling of goods
  • GB/T 19655 Auxiliaries for lamps.Starting devices (other than glow starters).Performance requirements*2016-04-25 Update
  • GB/T 2423.10 Environmental testing—Part 2:Test methods—Test Fc:Vibration(sinusoidal)*2019-06-04 Update
  • GB/T 2828.1 Inspection procedure by count sampling part 1: Lot by lot inspection sampling plan retrieved by acceptance quality limit (AQL)*2013-02-15 Update
  • GB/T 2829 Sampling procedures and tables for periodic inspection by attributes (Apply to inspection of process stability)
  • GB/T 2900.65 Electrician Terminology Lighting*2023-11-27 Update
  • QB 2274 Classification and model designation method of electric light source products

GB/T 22935-2008 history

Metal-halide lamps for projecting apparatus



Copyright ©2024 All Rights Reserved