GB/T 21411.1-2008
Downhole equipment for petroleum and natural gas industries.Progressing cavity pump systems for artificial lift.Part 1:Pumps (English Version)

Standard No.
GB/T 21411.1-2008
Language
Chinese, Available in English version
Release Date
2008
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Status
 2015-10
Replace By
GB/T 21411.1-2014
Latest
GB/T 21411.1-2014
Scope
This Part establishes the specifications and requirements for downhole screw pumps used in the oil and gas industry. A progressive cavity pump system is a single-phase or multi-phase flow oil recovery system and follows the definitions given in Chapter 2. This section applies to downhole screw pump systems. It mentions but does not include intermediate parts and accessories necessary to form a complete pump system. This section does not cover the requirements for loading and unloading, sea transportation and land transportation.

GB/T 21411.1-2008 history

  • 2014 GB/T 21411.1-2014 Petroleum and natural gas industries.Progressing cavity pump systems for artificial lift.Part 1:Pumps
  • 2008 GB/T 21411.1-2008 Downhole equipment for petroleum and natural gas industries.Progressing cavity pump systems for artificial lift.Part 1:Pumps
Downhole equipment for petroleum and natural gas industries.Progressing cavity pump systems for artificial lift.Part 1:Pumps

GB/T 21411.1-2008 -All Parts




Copyright ©2024 All Rights Reserved