GB/T 13632.2-2006
Measurements for monitoring adequate cooling within the core of pressurized light water reactors - Part 2: Instrumentation requirements during cold shutdown (English Version)

Standard No.
GB/T 13632.2-2006
Language
Chinese, Available in English version
Release Date
2006
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 13632.2-2006
Scope
This part specifies the requirements for monitoring instruments for adequate core cooling during cold shutdown. This section is applicable to the design of core cooling monitoring instruments when designing or modifying configurations similar to those shown in Figure 1 and Figure 2 (hereinafter referred to as PWR).

GB/T 13632.2-2006 Referenced Document

  • GB/T 12727 Appraisal of electrical equipment important to safety in nuclear power plants*2023-05-23 Update
  • GB/T 13625 Seismic qualification of safety class electrical equipment for nuclear power plants*2018-05-14 Update
  • GB/T 13630 Design of control room of nuclear power plants*2015-10-09 Update
  • GB/T 7166 Characteristics and test methods for in-core and primary coolant circuit temperature sensors in nuclear power plants*2015-10-09 Update

GB/T 13632.2-2006 history

  • 2006 GB/T 13632.2-2006 Measurements for monitoring adequate cooling within the core of pressurized light water reactors - Part 2: Instrumentation requirements during cold shutdown
Measurements for monitoring adequate cooling within the core of pressurized light water reactors - Part 2: Instrumentation requirements during cold shutdown

GB/T 13632.2-2006 -All Parts




Copyright ©2024 All Rights Reserved