AS 2419.1:2005
Fire hydrant installations - System design, installation and commissioning

Standard No.
AS 2419.1:2005
Release Date
2005
Published By
Standard Association of Australia (SAA)
Status
Replace By
AS 2419.1:2005/Amdt 1:2007
Latest
AS 2419.1:2021
Replace
AS 2419.1-1994
Scope
Specifies requirements for the design, installation and commissioning of fire hydrants.

AS 2419.1:2005 Referenced Document

  • AS 1074 Steel tubes and tubulars for ordinary service
  • AS 1345 Identification of the contents of pipes, conduits and ducts
  • AS 1349 Bourdon tube pressure and vacuum gauge

AS 2419.1:2005 history

  • 2021 AS 2419.1:2021 Fire hydrant installations, Part 1: System design, installation and commissioning
  • 2017 AS 2419.1:2017 Fire hydrant installations, Part 1: System design, installation and commissioning
  • 1970 AS 2419.1:2005/Amdt 1:2007 Fire hydrant installation - system design, installation and commissioning
  • 2005 AS 2419.1:2005 Fire hydrant installations - System design, installation and commissioning
  • 1970 AS 2419.1:1994/Amdt 2:2004 Fire hydrant device system design, installation and commissioning
  • 1970 AS 2419.1:1994/Amdt 1:1996 Fire hydrant device system design, installation and commissioning
  • 1994 AS 2419.1:1994 Fire hydrant installations - System design, installation and commissioning



Copyright ©2024 All Rights Reserved