AS 2419.1 specifies requirements for the design, installation and commissioning and testing of fire hydrant installations that are used for the protection of buildings, structures, storage yards, marinas and associated moored vessels, wharves, and plant.
AS 2419.1:2021 history
2021AS 2419.1:2021 Fire hydrant installations, Part 1: System design, installation and commissioning
2017AS 2419.1:2017 Fire hydrant installations, Part 1: System design, installation and commissioning
1970AS 2419.1:2005/Amdt 1:2007 Fire hydrant installation - system design, installation and commissioning
2005AS 2419.1:2005 Fire hydrant installations - System design, installation and commissioning