HB 7766-2005
Installation general requirements of gas Turbine turnkey installation (English Version)

Standard No.
HB 7766-2005
Language
Chinese, Available in English version
Release Date
2005
Published By
Professional Standard - Aviation
Latest
HB 7766-2005
Scope
This standard specifies the installation requirements for gas turbines and complete sets of equipment (hereinafter referred to as complete sets of equipment). This standard applies to the installation of complete sets of gas turbine equipment for power generation. Complete sets of gas turbine equipment for ships and mechanical drives can be implemented as a reference.

HB 7766-2005 Referenced Document

  • GB 50093 Code for construction and quality acceptance of automation instrumentation engineering*2013-01-28 Update
  • GB 50169 English version of 10 engineering construction standards including "Code for Construction and Acceptance of Grounding Devices in Electrical Installation Engineering"*2020-01-10 Update
  • GB 50170 Construction and acceptance standards for rotating electrical machines in electrical installation engineering*2018-11-13 Update
  • GB 50171 Code for construction and acceptance of switchboard outfit complete cubicle and secondary circuit electric equipment installation engineering*2012-05-28 Update
  • GB 50231 General code for construction and acceptance of mechanical equipment installation engineering *2009-03-19 Update

HB 7766-2005 history

  • 2005 HB 7766-2005 Installation general requirements of gas Turbine turnkey installation
Installation general requirements of gas Turbine turnkey installation