GB/T 21412.5-2017
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 5: Subsea umbilicals (English Version)
Home
GB/T 21412.5-2017
Standard No.
GB/T 21412.5-2017
Language
Chinese,
Available in English version
Release Date
2017
Published By
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会
Latest
GB/T 21412.5-2017
Replace
GB/T 21412.5-2010
GB/T 21412.5-2017 history
2017
GB/T 21412.5-2017
Petroleum and natural gas industries—Design and operation of subsea production systems—Part 5: Subsea umbilicals
2010
GB/T 21412.5-2010
Petroleum and natural gas industries.Design and operation of subsea production systems.Part 5:Subsea umbilicals
GB/T 21412.5-2017 -All Parts
GB/T 21412.1-2010 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 1:General requirements and recommendations
GB/T 21412.10-2019 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 10: Specification for bonded flexible pipe
GB/T 21412.11-2019 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 11:Recommended practice for flexible pipe
GB/T 21412.15-2017 Petroleum and natural gas industries—Design and operation of subsea production systems—Part15:Subsea structures and manifolds
GB/T 21412.2-2022 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 2:Unbonded flexible pipe systems for subsea and marine applications
GB/T 21412.3-2009 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 3:Through flowline(TFL)systems
GB/T 21412.4-2013 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 4: Subsea wellhead and tree equipment
GB/T 21412.5-2017 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 5: Subsea umbilicals
GB/T 21412.6-2018 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 6:Subsea production control systems
GB/T 21412.7-2018 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 7:Completion/workover riser systems
GB/T 21412.8-2010 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 8:Remotely Operated Vehicle(ROV) interfaces on subsea production systems
GB/T 21412.9-2009 Petroleum and natural gas industries.Design and operation of subsea production systems.Part 9:Remotely Operated Tool(ROT) intervention systems
Copyright ©2023 All Rights Reserved