TB/T 3523.3-2018
Test methods for AC drive electric locomotives Part 3: Temperature rise, electrical protection and auxiliary unit tests (English Version)

Standard No.
TB/T 3523.3-2018
Language
Chinese, Available in English version
Release Date
2019
Published By
Professional Standard - Railway
Latest
TB/T 3523.3-2018
Replace
TB/T 2519-1995 TB/T 2523-1995 TB/T 2520-2014

TB/T 3523.3-2018 history

  • 2019 TB/T 3523.3-2018 Test methods for AC drive electric locomotives Part 3: Temperature rise, electrical protection and auxiliary unit tests
  • 2014 TB/T 2520-2014 Test methods for starting and power of the auxiliary system equipped on the rolling stock
  • 1995 TB/T 2520-1995 Test method for start-up and power measurement of auxiliary machinery after assembly

TB/T 3523.3-2018 Test methods for AC drive electric locomotives Part 3: Temperature rise, electrical protection and auxiliary unit tests has been changed from TB/T 2519-1995 Test method for temperature rise of electric locomotive traction motor after installation.

TB/T 3523.3-2018 Test methods for AC drive electric locomotives Part 3: Temperature rise, electrical protection and auxiliary unit tests has been changed from TB/T 2523-1995 Test method for grounding overload protection of electric locomotive.

TB/T 3523.3-2018 Test methods for AC drive electric locomotives Part 3: Temperature rise, electrical protection and auxiliary unit tests has been changed from TB/T 2520-2014 Test methods for starting and power of the auxiliary system equipped on the rolling stock.

Test methods for AC drive electric locomotives Part 3: Temperature rise, electrical protection and auxiliary unit tests



Copyright ©2023 All Rights Reserved