This publication contains the Rules of Procedure of the Scheme of the IECQ System, hereinafter referred to as the "Rules", for the Independent Testing Laboratory Scheme (IECQ ITL Scheme). This IECQ Independent Testing Laboratory Scheme Rules of Procedure provides the requirements specific to this scheme and is to be used in conjunction with applicable IECQ System management Basic Rules (IEC CA 01, IECQ 01-S and IECQ 02), General Rules of Procedures (IECQ 03-1) and IECQ Operational Documents (OD) as listed in normative references Clause 2. In the event of conflict between the provisions of these Rules of Procedure and any other requirements contained in referenced normative documents, the requirements of these Rules of Procedure shall apply.
IECQ 03-6-2018 Referenced Document
IEC CA 01:2017 IEC Conformity Assessment Systems - Basic Rules