CFR 24-3280.504-2013
Housing and Urban Development. Part3280:Manufactured home construction and safety standards. Section3280.504:Condensation control and installation of vapor retarders.

Standard No.
CFR 24-3280.504-2013
Release Date
2013
Published By
US-CFR-file
Latest
CFR 24-3280.504-2013
Scope
(a) Ceiling vapor retarders. (1) In Uo Value Zones 2 and 3, ceilings must have a vapor retarder with a permeance of not greater than 1 perm (as measured by ASTM E 96–95 Standard Test Methods for Water Vapor Transmission of Materials) installed on the li

CFR 24-3280.504-2013 history

  • 2013 CFR 24-3280.504-2013 Housing and Urban Development. Part3280:Manufactured home construction and safety standards. Section3280.504:Condensation control and installation of vapor retarders.



Copyright ©2024 All Rights Reserved