GOST IEC 60947-4-3-2014
Low-voltage switchgear and controlgear. Part 4-3. Contactors and motor starters. AC semiconductor controllers and contactors for non-motor loads

Standard No.
GOST IEC 60947-4-3-2014
Release Date
2014
Published By
RU-GOST R
Status
 2018-11
Replace By
GOST IEC 60947-4-3-2017
Latest
GOST IEC 60947-4-3-2017

GOST IEC 60947-4-3-2014 Referenced Document

  • IEC 60050-161:1990 International elektrotechnical vocabulary; chapter 161: electromagnetic compatibility
  • IEC 60085:2007 Electrical insulation - Thermal evaluation and designation
  • IEC 60269-1:2006 Low-voltage fuses - Part 1: General requirements
  • IEC 60410:1973 Sampling plans and procedures for inspection by attributes
  • IEC 60439-1:1999 Low-voltage switchgear and controlgear assemblies - Part 1: Type-tested and partially type-tested assemblies
  • IEC 60664:1980 Insulation Co-ordination within Low-Voltage Systems including Clearances and Creepage Distances for Equipment (Edition 1.0; See IEC 60664-1)
  • IEC 60947-1:2007 Low-voltage switchgear and controlgear - Part 1: General rules
  • IEC 60947-4-2:1999 Low-Voltage Switchgear and Controlgear - Part 4-2: Contactors and Motor-Starters - AC Semiconductor Motor Controllers and Starters (Edition 2.0; Amendment 1: 10-2001; Corrigendum 1: March 2002)
  • IEC 61000-3-2:2005 Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic current emissions (equipment input current 16 A per phase)
  • IEC 61000-4-11:2004 Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests
  • IEC 61000-4-2:2008 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measuring techniques - Electrostatic discharge immunity test
  • IEC 61000-4-3:2006 Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test
  • IEC 61000-4-4:2004 Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
  • IEC 61000-4-5:2005 Electromagnetic compatibility (EMC) - Part 4-5: Testing and measurement techniques - Surge immunity test
  • IEC 61000-4-6:2008 Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields

GOST IEC 60947-4-3-2014 history

  • 2018 GOST IEC 60947-4-3-2017 Low-voltage switchgear and controlgear. Part 4-3. Contactors and motor-starters. AC semiconductor controllers and contactors for non-motor loads
  • 2014 GOST IEC 60947-4-3-2014 Low-voltage switchgear and controlgear. Part 4-3. Contactors and motor starters. AC semiconductor controllers and contactors for non-motor loads



Copyright ©2023 All Rights Reserved