GB/T 8117.3-2014
Rules for steam turbine thermal acceptance test.Part 3:Method C.Thermal performance verification tests of retrofitted steam turbines (English Version)

Standard No.
GB/T 8117.3-2014
Language
Chinese, Available in English version
Release Date
2014
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 8117.3-2014
Scope
This part of GB/T 8117, also known as "Retrofit Regulations", sets out supplementary modification procedures for thermal performance verification tests for retrofitting steam turbines. The provisions given in this section follow the guidelines in GB/T 8117.2-2008, but also modify and supplement the guaranteed value of the modified steam turbine and verify the guaranteed value through the thermal performance acceptance test. This section gives the general principles of preparation, implementation, calculation, comparison of test results and guaranteed values, and measurement uncertainty of verification tests. This section is only applicable to performance verification tests of certain hardware modifications in steam turbine equipment. This section does not apply to any improvement of the circulation system or any modification of other power plant equipment (such as boilers, feed water heaters, etc.).

GB/T 8117.3-2014 history

  • 2014 GB/T 8117.3-2014 Rules for steam turbine thermal acceptance test.Part 3:Method C.Thermal performance verification tests of retrofitted steam turbines
Rules for steam turbine thermal acceptance test.Part 3:Method C.Thermal performance verification tests of retrofitted steam turbines

GB/T 8117.3-2014 -All Parts




Copyright ©2024 All Rights Reserved