YC/T 488-2014
Threshing & redrying line and primary processing line.The guide for site installation design and construction of electronic control system (English Version)

Standard No.
YC/T 488-2014
Language
Chinese, Available in English version
Release Date
2014
Published By
Professional Standard - Tobacco
Latest
YC/T 488-2014
Scope
This standard specifies the basic principles and technical requirements for the design and construction that should be followed for the on-site installation of electronic control systems for threshing and re-baking production lines and silk production lines (hereinafter collectively referred to as production lines). This standard applies to the design and construction of on-site installation of electronic control systems for threshing and re-baking production lines and silk production lines.

YC/T 488-2014 Referenced Document

  • CECS 31-2006 Code for design of steel cable tray engineering
  • GB 50171 Code for construction and acceptance of switchboard outfit complete cubicle and secondary circuit electric equipment installation engineering
  • GB 50217 Design Standards for Power Engineering Cables*2018-02-12 Update
  • GB 5226.1-2008 Electrical safety of machinery - Electrical equipment for machinery - Part 1: General specifications
  • GB/T 19666-2005 Flame retardant and fire resistant wires and cables
  • GB/T 5094.1-2002 Industrial systems,installations and equipment and industrial products--Structuring principles and reference designations Part 1: Basic rules
  • GB/T 9330.1 Plastic insulated control cables.Part 1:General requirements
  • JB/T 6743 Corrosion-resistant environmental technical requirements for indoor and outdoor steel-made cable support system
  • YC/T 384.2-2011 Norms for work safety standardization of tobacco enterprises. Part 2: Norms for safety technology and on-site

YC/T 488-2014 history

  • 2014 YC/T 488-2014 Threshing & redrying line and primary processing line.The guide for site installation design and construction of electronic control system
Threshing & redrying line and primary processing line.The guide for site installation design and construction of electronic control system



Copyright ©2024 All Rights Reserved