DL/T 827-2014
Start-up test code for bulb Hydro-generating units (English Version)

Standard No.
DL/T 827-2014
Language
Chinese, Available in English version
Release Date
2014
Published By
Professional Standard - Electricity
Latest
DL/T 827-2014
Replace
DL/T 827-2002
Scope
This standard specifies the start-up and trial operation test procedures and requirements for bulb tubular units with a single unit of more than 5MW and a runner diameter of more than 2.5m. This standard is applicable to the start-up trial operation test and handover acceptance of tubular turbine generator units and related equipment in hydropower stations. The start-up trial operation test of other cross-flow units can refer to this standard.

DL/T 827-2014 history

  • 2014 DL/T 827-2014 Start-up test code for bulb Hydro-generating units
  • 2002 DL/T 827-2002 Start-up test code for bulb turbine and generator units
Start-up test code for bulb Hydro-generating units