SY/T 5587.14-2013
Codes for conventional workover job.Part 14: Cementing plug and drilling out (English Version)

Standard No.
SY/T 5587.14-2013
Language
Chinese, Available in English version
Release Date
2013
Published By
Professional Standard - Petroleum
Latest
SY/T 5587.14-2013
Replace
SY/T 5587.14-2004
Scope
This part of SY/T 5587 specifies the construction design, construction preparation, operating procedures, quality control, oil layer protection, health, safety and environmental control requirements for injection plugs (cement injection plugs) and drilling plugs (drilling cement plugs) in oil and gas wells. , data collection and construction summary preparation, etc. This section applies to plug injection and plug drilling operations in oil, gas and water wells.

SY/T 5587.14-2013 Referenced Document

  • GB/T 19139 Testing of well cements
  • SY 5727 Safety rules of downhole services*2014-10-15 Update
  • SY/T 5587.3 Codes for conventional workover job.Part 3: Killing well, displaced flow and induced flow
  • SY/T 5587.5 General well workover operation procedures Part 5: Wellbore preparation for underground operations*2018-10-29 Update
  • SY/T 6610 Operational Safety Code for Underground Workplaces in Hydrogen Sulfide Environment*2017-08-01 Update
  • SY/T 6646 Abandoned and Long Stopped Well Disposal Guidelines*2017-11-15 Update

SY/T 5587.14-2013 history

  • 2013 SY/T 5587.14-2013 Codes for conventional workover job.Part 14: Cementing plug and drilling out
  • 2004 SY/T 5587.14-2004 Conventional Well Workover Operation Regulations Part 14: Plugging and Drilling
  • 1993 SY/T 5587.14-1993 Oil and water well routine workover operation cement plug operation rules
Codes for conventional workover job.Part 14: Cementing plug and drilling out



Copyright ©2024 All Rights Reserved