ASTM D5299-99(2012)e1
Standard Guide for Decommissioning of Groundwater Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities

Standard No.
ASTM D5299-99(2012)e1
Release Date
1999
Published By
American Society for Testing and Materials (ASTM)
Status
Replace By
ASTM D5299/D5299M-17
Latest
ASTM D5299/D5299M-18
Scope
1.1 This guide covers procedures that are specifically related to permanent decommissioning (closure) of the following as applied to environmental activities. It is intended for use where solid or hazardous materials or wastes are found, or where conditions occur requiring the need for decommissioning. The following devices are considered in this guide:

1.1.1 A borehole used for geoenvironmental purposes (see Note 1),

1.1.2 Monitoring wells,

1.1.3 Observation wells,

1.1.4 Injection wells (see Note 2),

1.1.5 Piezometers,

1.1.6 Wells used for the extraction of contaminated groundwater, the removal of floating or submerged materials other than water such as gasoline or tetrachloroethylene, or other devices used for the extraction of soil gas,

1.1.7 A borehole used to construct a monitoring well, and

1.1.8 Any other vadose zone monitoring device.

1.2 Temporary decommissioning of the above is not covered in this guide.

ASTM D5299-99(2012)e1 Referenced Document

  • ASTM C150 Standard Specification for Portland Cement
  • ASTM D420 Standard Guide to Site Characterization for Engineering Design and Construction Purposes
  • ASTM D4380 Standard Test Method for Density of Bentonitic Slurries*2006-02-01 Update
  • ASTM D5088 Standard Practice for Decontamination of Field Equipment Used at Nonradioactive Waste Sites*2002-01-10 Update
  • ASTM D5092 Standard Practice for Design and Installation of Ground Water Monitoring Wells in Aquifers
  • ASTM D653 Standard Terminology Relating to Soil, Rock, and Contained Fluids

ASTM D5299-99(2012)e1 history

  • 2018 ASTM D5299/D5299M-18 Standard Guide for Decommissioning of Groundwater Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities
  • 2017 ASTM D5299/D5299M-17 Standard Guide for Decommissioning of Groundwater Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities
  • 1999 ASTM D5299-99(2012)e1 Standard Guide for Decommissioning of Groundwater Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities
  • 1999 ASTM D5299-99(2005) Standard Guide for Decommissioning of Ground Water Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities
  • 1999 ASTM D5299-99 Standard Guide for Decommissioning of Ground Water Wells, Vadose Zone Monitoring Devices, Boreholes, and Other Devices for Environmental Activities
Standard Guide for  Decommissioning of Groundwater Wells, Vadose Zone Monitoring  Devices, Boreholes, and Other Devices for Environmental Activities



Copyright ©2024 All Rights Reserved