NB/T 20057.3-2012
PWR nuclear power plants reactor system design.Core.Part3:Fuel assembly (English Version)

Standard No.
NB/T 20057.3-2012
Language
Chinese, Available in English version
Release Date
2012
Published By
Professional Standard - Energy
Status
 2024-04
Replace By
NB/T 20057.3-2023
Latest
NB/T 20057.3-2023
Replace
EJ/T 323-1998
Scope
This standard specifies the design criteria for core fuel assemblies in the design of reactor systems for pressurized water reactor nuclear power plants. This section applies to the design of fuel assemblies for pressurized water reactor nuclear power plants using pickaxe alloy as packaging tubes, UO pellets and/or UO-GdO pellets or ZrB-coated UO pellets as fuel, and other cladding and fuel materials. Fuel assembly design can also be implemented as a reference.

NB/T 20057.3-2012 Referenced Document

  • NB/T 20035-2011 Categorization of conditions of PWR nuclear power plants

NB/T 20057.3-2012 history

  • 2023 NB/T 20057.3-2023 Pressurized Water Reactor Nuclear Power Plant Reactor System Design Reactor Core Part 3: Fuel Assemblies
  • 2012 NB/T 20057.3-2012 PWR nuclear power plants reactor system design.Core.Part3:Fuel assembly
  • 1998 EJ/T 323-1998 Design criteria of fuel assembly for PWR nuclear power plant
  • 1988 EJ 323-1988 Fuel Assembly Design Criteria for Pressurized Water Reactor Nuclear Power Plants

NB/T 20057.3-2012 PWR nuclear power plants reactor system design.Core.Part3:Fuel assembly has been changed from EJ/T 323-1998 Design criteria of fuel assembly for PWR nuclear power plant.

PWR nuclear power plants reactor system design.Core.Part3:Fuel assembly



Copyright ©2024 All Rights Reserved