This document gives the requirements for factory production control (FPC) for the manufacturer of road marking materialsThis document specifies which types of test have to be taken into consideration within the FPC but it leaves the precise methods to be applied to be dependent on the characteristics of the manufacturer's installation and production methods. The precise parameters and methods will be found in the written procedures agreed between the manufacturer and the third party responsible for the initial assessment of the FPC.
EN 13212:2011 history
2011EN 13212:2011 Road marking materials - Requirements for factory production control
2001EN 13212:2001 Road Marking Materials - Requirements for Factory Production Control