This standard specifies the process design, construction operation requirements, gas lift commissioning and operation, gas lift production well management and health, safety and environmental control using gas lift valves for gas lift drainage gas production. This standard applies to gas lift drainage and gas production process operations using gas lift valves in water-producing gas wells.
SY/T 6124-2010 Referenced Document
SY/T 5225-2005 Safety production technology procedures for fire & explosive protection of oil & gas drilling, development and storage transportation
SY/T 5587.3-2004 Conventional Well Workover Procedures Part 3: Oil and Gas Well Killing, Alternative Blowout, and Blowout Induction
SY/T 5810-2003 Design and downhole operation of continuous gas lift
SY/T 6277-2005 Specification of hydrogen sulfide monitoring and protecting for operation personnel in oil and gas field involving hydrogen sulfide
SY/T 6450-2000 Recommended practice for repairing ,testing and setting gas lift valves
SY/T 6484-2005 Recommended practice for operations, maintenance, and trouble-shooting of gas lift installations
SY/T 6610-2005 Recommended practice for oil and gas well servicing and workover operations involving hydrogen sulfide
SY/T 6124-2010 history
2017SY/T 6124-2017 Gas lift drainage gas recovery process
2010SY/T 6124-2010 Practice for water drainage and gas production by gas lift technology
1970SY/T 6124-1995 Gas-lift Drainage and Gas Recovery Technology