GB/T 24504-2009
The method of injection/falloff well test for coalbed methane well (English Version)

Standard No.
GB/T 24504-2009
Language
Chinese, Available in English version
Release Date
2009
Published By
General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China
Latest
GB/T 24504-2009
Scope
This standard specifies the technical contents of the design, equipment, construction procedures, data collection, data interpretation and well test report of coalbed methane well injection/pressure drop test. This standard applies to the tests performed during the drilling of coalbed methane wells or after well completion. The purpose is to obtain parameters such as coal seam permeability, reservoir pressure, skin coefficient, detection radius, and in-situ stress.

GB/T 24504-2009 Referenced Document

  • SY/T 6580 Commonly used quantities and units for oil and gas exploration and development

GB/T 24504-2009 history

  • 2009 GB/T 24504-2009 The method of injection/falloff well test for coalbed methane well
The method of injection/falloff well test for coalbed methane well



Copyright ©2024 All Rights Reserved