DIN 19569-9:2004 Wastewater treatment plants - Principles for the design of structures and technical equipment - Part 9: Mechanical drainage of sewage sludge
The project specifies requirements for mechanical drainage of sewage sludge in regard to such buildings or parts of buildings for which order or function of the technical equipment shall be taken into account; technical equipment, as far as clearing-specific technical or clearingsystem-dependent demands on planing, construction and operation have to be considered.
DIN 19569-9:2004 history
2017DIN 19569-9:2017-02 Wastewater treatment plants - Principles for the design of structures and technical equipment - Part 9: Mechanical drainage of sewage sludge / Note: Applies in conjunction with DIN EN 12255-1 (2002-04), DIN EN 12255-8 (2001-10).
2017DIN 19569-9:2017 Wastewater treatment plants - Principles for the design of structures and technical equipment - Part 9: Mechanical drainage of sewage sludge
2004DIN 19569-9:2004 Wastewater treatment plants - Principles for the design of structures and technical equipment - Part 9: Mechanical drainage of sewage sludge