GB/T 16453.3-2008 Comprehensive control of soil and water conservation.Technical specification.Technique for erosion control of gullies (English Version)
This part of GB/T 16453 stipulates the survey, planning, project layout, hydrological calculation, design, construction, project management and utilization of dam sites of various buildings, etc. Require. The scope of application of this part: a) Goutou protection project and Gufang project are partly applicable to plateau areas, hilly areas, Mangang areas and earth-rock mountainous areas in northern my country (Northwest, Northeast, North China); b) Warping dam projects are partly applicable In Northwest China, North China, and Northeast Loess Regions. In other areas of our country, in the treatment of ravines, all dams in the ravines have the effect of retaining mud and silt (including the sand retaining dams in southern my country) can be used as a reference. The check dams in this section are mainly rolling-type homogeneous earth dams. For issues related to the design and construction of water-drop dams, this part only provides some principled provisions. For details, refer to SL302.
GB/T 16453.3-2008 Referenced Document
GB/T 15772-2008 Comprehensive control of soil and water conservation.General rule of planning
GB/T 15774 Comprehensive control of soiland water conservation.Method of benefit calculation
GB/T 16453.4 Comprehensive control of soil and water conservation.Technical specification.Small engineering of store,drainage and draw water
SL 289 Technical code of key dam for soil and water conservation(explanation)
SL 302 Technical specification for sluicing-siltation earth dam(explanation)
GB/T 16453.3-2008 history
2008GB/T 16453.3-2008 Comprehensive control of soil and water conservation.Technical specification.Technique for erosion control of gullies
1996GB/T 16453.3-1996 Regulation of techniques for comprehensive control of soil erosion--Technique for erosion control of gullies