JC/T 429-2007 The methods for the calculation of the efndeney, unit heat consumption and unit coal consumption of dryer annular tunnel kiln system (English Version)
This standard specifies the calculation method and expression of calculation results for the thermal efficiency, unit heat consumption, and unit coal consumption of the brick and tile industrial tunnel kiln-drying chamber system. This standard is applicable to the thermal balance of brick and tile production consisting of two thermal equipment, a tunnel kiln and a drying chamber. At the same time, the two cooperate with each other to complete drying and firing operations, that is, the kiln provides heat source to the drying chamber, and the drying chamber provides dry blanks to the kiln. system.
JC/T 429-2007 Referenced Document
JC/T 428 The methods for the measurement and calculation of heat balance, heat efnciencyof tunnel kiln
JC/T 792 Measurement and calculation method of heat balance and thermal efficiency of tunnel type brick and tile drying chamber*, 2019-11-11 Update
JC/T 429-2007 history
2019JC/T 429-2019 Brick and tile industrial tunnel kiln-drying chamber system thermal efficiency, unit heat consumption, unit coal consumption calculation method
2007JC/T 429-2007 The methods for the calculation of the efndeney, unit heat consumption and unit coal consumption of dryer annular tunnel kiln system
1991JC/T 429-1991 Brick and Tile Industrial Tunnel Kiln—Calculation Method of Thermal Efficiency, Unit Heat Consumption and Unit Coal Consumption of Drying Chamber System