IEC TS 60034-27:2006
Rotating electrical machines - Part 27: Off-line partial discharge measurements on the stator winding insulation of rotating electrical machines

Standard No.
IEC TS 60034-27:2006
Release Date
2006
Published By
International Electrotechnical Commission (IEC)
Latest
IEC TS 60034-27:2006
Replace By
IEC 60034-27-1:2017
Replace
IEC 2/1384/DTS:2006
Scope
This part of IEC 60034 which is a technical specification provides a common basis for – measuring techniques and instruments, – the arrangement of test circuits, – normalization and testing procedures, – noise reduction, – the documentation of test results, – the interpretation of test results with respect to partial discharge off-line measurements on the stator winding insulation of rotating electrical machines when tested with alternating voltages up to 400 Hz. This technical specification applies to rotating machines having bars or form wound coils with conductive slot coating. This is usually valid for machines with voltage rating of 6 kV and higher. The measurement methods described in this specification may also be applied to machines without conductive slot coating. However, results may be different and are not covered by this specification.

IEC TS 60034-27:2006 history

  • 2006 IEC TS 60034-27:2006 Rotating electrical machines - Part 27: Off-line partial discharge measurements on the stator winding insulation of rotating electrical machines

IEC TS 60034-27:2006 Rotating electrical machines - Part 27: Off-line partial discharge measurements on the stator winding insulation of rotating electrical machines has been changed from IEC 2/1384/DTS:2006 IEC 60034-27-TS, Ed. 1: Rotating electrical machines - Part 27: Off-line partial discharge measurements on the stator winding insulation of rotating electrical machines.

IEC TS 60034-27:2006 Rotating electrical machines - Part 27: Off-line partial discharge measurements on the stator winding insulation of rotating electrical machines was changed to IEC 60034-27-1:2017 Rotating electrical machines - Part 27-1: Off-line partial discharge measurements on the winding insulation.

Rotating electrical machines - Part 27: Off-line partial discharge measurements on the stator winding insulation of rotating electrical machines



Copyright ©2024 All Rights Reserved