SAE J1489-2000
Heavy Truck and Bus Retarder Downhill Performance Mapping Procedure

Standard No.
SAE J1489-2000
Release Date
2000
Published By
Society of Automotive Engineers (SAE)
Latest
SAE J1489-2000
Scope
The procedure covers the estimation of the total retardation capability available to a specific vehicle from: a) natural retardation (rolling resistance, aerodynamic drag, etc); b) engine drag; and c) engine, integral automatic transmission, driveline or trailer-axle retarders. It assumes that foundations brakes are not used for maintaining speed on long mountain descents. Retardation is rated in terms of the maximum grades on which stable control speeds can be maintained for each gear over the range of highway speeds appropriate to that gear. For each gear, the calculation procedure determines maximum grades for at least four values of control speed ranging from the vehicle velocity corresponding to full load governed engine rpm, to the vehicle velocity corresponding to the engine rpm at minimum (idle) speed. in addition, the calculation procedure provides information on the total retarding power available for each gear. This procedure provides a uniform method for calculating and reporting the steady state control speed maintainable by either engine, integral automatic transmission, driveline, or trailer-axle retarders employed by heavy trucks and buses operating on downgrades. It provides a practical method of predicting retarder performance in a specified vehicle installation using data describing retarder performance characteristics and other vehicle design variables. It is intended to assist in the proper selection of a retarder by matching stated retarder performance capabilities with particular vehicle functioning requirements.

SAE J1489-2000 Referenced Document

SAE J1489-2000 history

  • 2000 SAE J1489-2000 Heavy Truck and Bus Retarder Downhill Performance Mapping Procedure
  • 1987 SAE J1489-1987 Heavy Truck and Bus Retarder Downhill Performance Mapping Procedure@ Recommended Practice (June 1987)
Heavy Truck and Bus Retarder Downhill Performance Mapping Procedure



Copyright ©2024 All Rights Reserved