NB/T 31078-2022
Wind farm grid connection performance evaluation method (English Version)

Standard No.
NB/T 31078-2022
Language
Chinese, Available in English version
Release Date
2022
Published By
Professional Standard - Energy
Latest
NB/T 31078-2022
Replace
NB/T 31078-2016 NB/T 31077-2016
Scope
This document stipulates the overall requirements, evaluation items and evaluation methods for wind farm grid-connected performance evaluation. This document applies to newly built or renovated (expanded) onshore wind farms connected to the power system through voltage lines of 110 (66) kV and above. Wind farms connected to the power system through lines of other voltage levels can refer to this implementation.

NB/T 31078-2022 history

  • 2022 NB/T 31078-2022 Wind farm grid connection performance evaluation method
  • 2016 NB/T 31078-2016 Wind farm grid connection performance evaluation method

NB/T 31078-2022 Wind farm grid connection performance evaluation method has been changed from NB/T 31077-2016 Wind farm low voltage ride through modeling and evaluation method.

Wind farm grid connection performance evaluation method



Copyright ©2024 All Rights Reserved