DB34/T 1928-2013
Test procedures for cement-soil cut-off walls in water conservancy and hydropower projects (English Version)

Standard No.
DB34/T 1928-2013
Language
Chinese, Available in English version
Release Date
2013
Published By
Anhui Provincial Standard of the People's Republic of China
Latest
DB34/T 1928-2013
Scope
This standard specifies the terms and definitions of soil-cement interception walls in water conservancy and hydropower projects, preparation of cement-soil samples, physical property tests of cement-soil, mechanical property tests of cement-soil, permeability tests of soil-cement interception walls and thickness of soil-cement interception walls. and uniformity testing. This standard is applicable to indoor testing, on-site testing and quality inspection of cement and soil interception walls in water conservancy and hydropower projects. Other similar projects can be implemented as a reference. In addition to complying with this standard, the test work of cement and soil interception walls in water conservancy and hydropower projects should also comply with the relevant current national and industry standards.

DB34/T 1928-2013 history

  • 2013 DB34/T 1928-2013 Test procedures for cement-soil cut-off walls in water conservancy and hydropower projects
Test procedures for cement-soil cut-off walls in water conservancy and hydropower projects



Copyright ©2024 All Rights Reserved