SAE AS683C-2006
Installation Procedures and Torques for Fluid Connections

Standard No.
SAE AS683C-2006
Release Date
2006
Published By
Society of Automotive Engineers (SAE)
Status
Replace By
SAE AS683D-2012
Latest
SAE AS683E-2019
Scope
These procedures cover the following: Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket. Paragraph 4 - Boss end connections, positioned type, with back-up ring. Paragraph 5 - Boss end connections, positioned type, without back-up ring Paragraph 6 - Boss end connections, non-positioned type. Paragraph 7 - Bulkhead connections.

SAE AS683C-2006 history

  • 2019 SAE AS683E-2019 Installation Procedures and Torques for Fluid Connections
  • 2012 SAE AS683D-2012 Installation Procedures and Torques for Fluid Connections
  • 2006 SAE AS683C-2006 Installation Procedures and Torques for Fluid Connections
  • 2001 SAE AS683C-2001 Installation Procedures and Torques for Fluid Connections
  • 1995 SAE AS683B-1995 INSTALLATION PROCEDURES AND TORQUES FOR FLUID CONNECTIONS
  • 1980 SAE AS683B-1980 Installation Procedures and Torques for Fluid Connections
  • 1976 SAE AS683A-1976 INSTALLATION PROCEDURES AND TORQUES FOR FLUID CONNECTIONS



Copyright ©2024 All Rights Reserved