DL/T 2596-2023
Intelligent electric energy meter field operation reliability test procedures (English Version)

Standard No.
DL/T 2596-2023
Language
Chinese, Available in English version
Release Date
2023
Published By
Professional Standard - Electricity
Latest
DL/T 2596-2023
Scope
This document stipulates the environmental conditions and environmental factor monitoring, test facilities and devices for on-site operation reliability testing of smart electric energy meters (hereinafter referred to as "electric energy meters"), statistical test plans and test procedures for on-site operation reliability of electric energy meters, evaluation of test results, and testing Records and test reports, etc. This document is applicable to the on-site operation reliability verification test in a louvered test shed or a low-voltage electric energy metering box before the newly purchased electric energy meter is put into operation for the first time. Note: A newly purchased electric energy meter refers to an electric energy meter purchased by the user that is no more than 1 year old. The meter age here refers to the survival time of the electric energy meter since the date of manufacture. It is the storage time, transportation time and The total storage time on the user side.

DL/T 2596-2023 history

  • 2023 DL/T 2596-2023 Intelligent electric energy meter field operation reliability test procedures
Intelligent electric energy meter field operation reliability test procedures



Copyright ©2024 All Rights Reserved