This document stipulates the conditions, content and methods for pre-acceptance and acceptance of offshore wind turbines (hereinafter referred to as "units") after they are installed, commissioned and connected to the grid for power generation. This document applies to offshore grid-connected wind turbines.
T/CRES 0008-2020 history
2020T/CRES 0008-2020 Acceptance Procedures of Offshore Wind Turbine Generator Systems