1.1?This guide is for placing (blind) actual leaks in geomembranes before performing an electrical leak location survey. The geomembranes can be bare (not covered) or can be covered with water or moist soil. 1.2?This guide is intended to serve as an additional quality control/q
ASTM D7909-21 history
2021ASTM D7909-21a Standard Guide for Placement of Intentional Leaks During Electrical Leak Location Surveys of Geomembranes
2021ASTM D7909-21 Standard Guide for Placement of (Blind) Actual Leaks During Electrical Leak Location Surveys of Geomembranes
2014ASTM D7909-14 Standard Guide for Placement of Blind Actual Leaks during Electrical Leak Location Surveys of Geomembranes