This document specifies the requirements for the on-site equipment integrity test, black start system performance test and test report of the black start system of the diesel auxiliary gas turbine unit. This document is applicable to the field test of the black start system of the diesel engine-assisted split-shaft gas turbine unit. See Appendix A for the wiring method. For the field test of the diesel system auxiliary black start system of gas turbine units with other wiring methods, please refer to this document.
T/JSEPA 012-2023 history
2023T/JSEPA 012-2023 Guide for filed test of auxiliary diesel generator black start system of gas turbine unit