HJ 1019-2019
Technical guidelines for Site Soil and Groundwater Sampling of Volatile Organic Compunds (English Version)

Standard No.
HJ 1019-2019
Language
Chinese, Available in English version
Release Date
2019
Published By
Professional Standard - Environmental Protection
Latest
HJ 1019-2019
Scope
This standard specifies the technical requirements for sampling volatile organic compounds in soil and groundwater. This standard applies to on-site sampling of volatile organic compounds in plot soil and groundwater environmental surveys and monitoring.

HJ 1019-2019 Referenced Document

  • GB 8978 Integrated wastewater discharge standard
  • HJ 25.1 Technical Guidelines for Investigation of Soil Pollution in Construction Land*2019-12-05 Update
  • HJ 25.2 Technical Guidelines for Soil Pollution Risk Control and Restoration Monitoring of Construction Land*2019-12-05 Update
  • HJ/T 164 Technical specifications for environmental monitoring of groundwater
  • HJ/T 166 Technical specification for soil environmental monitoring

HJ 1019-2019 history

  • 2019 HJ 1019-2019 Technical guidelines for Site Soil and Groundwater Sampling of Volatile Organic Compunds
Technical guidelines for Site Soil and Groundwater Sampling of Volatile Organic Compunds



Copyright ©2024 All Rights Reserved