(1) Scope This standard specifies the energy storage black start system test for gas turbine units with a capacity of 50MW and above. The energy storage black start test for gas turbine units with other capacities can refer to this document. (2) Normative reference documents (3) Terms and definitions include black start, energy storage system auxiliary gas turbine unit black start, black start test, isolated grid test, black start time, black start unit, Class A black start, Class B Definition of black start, battery energy storage power conversion system. (4) Static test (5) Dynamic test (6) Test report
T/CES 095-2022 history
2022T/CES 095-2022 Guide for field test of energy storage black start system of gas turbine unit