T/CAPID 005.4-2023 The outline of quality supervision and inspection of multiple solid waste combustion for power generation projects—Part 4: Supervision and inspection of before power receiving of the power plant electrical system (English Version)
This document stipulates the supervision and inspection of the power system of the waste incineration power generation project plant in the pre-power stage, including the general principles and verification methods of supervision and inspection, the conditions for supervision and inspection, the supervision and inspection requirements for the quality behavior of the responsible subject, and the supervision and inspection of the quality of the project entity. requirements and quality supervision and testing.
T/CAPID 005.4-2023 history
2023T/CAPID 005.4-2023 The outline of quality supervision and inspection of multiple solid waste combustion for power generation projects—Part 4: Supervision and inspection of before power receiving of the power plant electrical system