NB/T 31047.1-2022
Wind power dispatching and operation management specifications Part 1: Onshore wind power (English Version)

Standard No.
NB/T 31047.1-2022
Language
Chinese, Available in English version
Release Date
2022
Published By
Professional Standard - Energy
Latest
NB/T 31047.1-2022
Replace
NB/T 31047-2013
Scope
This document stipulates the grid connection management, commis ioning management, operation dis atch management, power generation plan management, maintenance management, relay protection and safety automatic device management, and communications of the grid dis atching agency and the grid-connected operating onshore wind farm (hereinafter referred to as the wind farm). Operation management and scheduling automation management requirements. This document is applicable to wind farms that are connected to the grid through transmis ion lines with voltage levels of 35 kV and above. Wind farms that are connected to the grid and are operated through other voltage levels can refer to this document for implementation.

NB/T 31047.1-2022 history

  • 2022 NB/T 31047.1-2022 Wind power dispatching and operation management specifications Part 1: Onshore wind power

NB/T 31047.1-2022 Wind power dispatching and operation management specifications Part 1: Onshore wind power has been changed from NB/T 31047-2013 Specification of dispatching and operating management for wind power.

Wind power dispatching and operation management specifications Part 1: Onshore wind power



Copyright ©2024 All Rights Reserved