This document specifies the technical requirements for the connection and power system of onshore wind farms. This document is applicable to newly built or reconstructed (expanded) onshore wind farms connected to the power system through 110 (66) KV and above voltage level lines. For onshore wind farms connected to the power system through other voltage levels, refer to the implementation.
GB/T 19963.1-2021 Referenced Document
DL/T 1870 Power System Network Source Coordination Technical Specifications
DL/T 448 Technical management regulations for electric energy metering devices
DL/T 5003 Design code for power system dispatching automation
GB 38755 Code on security and stability for power system
GB/T 14285 Technical regulations for relay protection and safety automatic devices*, 2023-11-27 Update
GB/T 14549 Quality of electric energy supply harmonics in public supply network
GB/T 15543 Power quality.Three-phase voltage unbalance
GB/T 19862 General requirements for monitoring equipment of power quality
GB/T 22239 Information security technology — Baseline for classified protection of cybersecurity
GB/T 24337 Power quality.Interharmonics in public supply network
GB/T 31464 The grid operation code*, 2022-12-30 Update
GB/T 36572 Guidelines of cyber security protection for electric power system supervision and control
GB/T 50063 Code for design of electrical measuring instrumentation devices for power installations
NB/T 31046 Wind power power prediction system functional specifications*, 2022-11-04 Update
NB/T 31055 Guidelines for assessment of theoretical power generation and curtailed wind power generation of wind farms*, 2022-11-04 Update
GB/T 19963.1-2021 history
2021GB/T 19963.1-2021 Technical specification for connecting wind farm to power system—Part 1: On shore wind power
2011GB/T 19963-2011 Technical rule for connecting wind farm to power system
2005GB/Z 19963-2005 Technical rule for connecting wind farm to power network
GB/T 19963.1-2021 Technical specification for connecting wind farm to power system—Part 1: On shore wind power has been changed from GB/T 19963-2011 Technical rule for connecting wind farm to power system .