ABS 181 NOTICE 1-2013
GUIDE FOR PROPULSION AND AUXILIARY SYSTEMS FOR GAS FUELED SHIPS

Standard No.
ABS 181 NOTICE 1-2013
Release Date
2013
Published By
ABS - American Bureau of Shipping
Latest
ABS 181 NOTICE 1-2013
Scope
General Plans and Data to be Submitted (1 February 2013) Plans and specifications covering the ship arrangements are to be submitted@ in addition to the requirements contained in each of the individual sections and are@ as applicable@ to include: Ship safety concept including propulsion and auxiliary arrangement requirements detailed under 2/5.1 of this Guide ? General arrangement ? Gas fuel storage arrangements ? Fuel gas supply system arrangements ? Fuel bunkering station arrangements ? Hazardous area classification plan ? Vent mast and venting arrangements

ABS 181 NOTICE 1-2013 history




Copyright ©2024 All Rights Reserved