SY/T 5849-1993
Method for evaluating plugging removal effect of chemical agents in oil and water wells (English Version)

Standard No.
SY/T 5849-1993
Language
Chinese, Available in English version
Published By
Professional Standard - Petroleum
Status
 2002-08
Replace By
SY/T 5849-2002
Latest
SY/T 5849-2018
Scope
This standard specifies the production evaluation and economic evaluation methods for the plugging-relieving effect of chemical agents in oil production wells and water injection wells. This standard is applicable to the evaluation of the effectiveness of chemical agent plugging measures in low-yield oil production wells and water injection wells. Not suitable for fracturing and large-scale acidification effect evaluation.

SY/T 5849-1993 history

  • 2018 SY/T 5849-2018 Evaluation method for the plugging effect of chemical agents in oil and water wells
  • 2002 SY/T 5849-2002 The method for economic effect evaluation of removing plugging by chemicals in production and injection well
  • 1970 SY/T 5849-1993 Method for evaluating plugging removal effect of chemical agents in oil and water wells
Method for evaluating plugging removal effect of chemical agents in oil and water wells



Copyright ©2024 All Rights Reserved