When the contractor for this specification is also
the contractor for the M605 LAP specification per MIL-F-12774 and the inspections and tests for both specificatfons are performed at the same plant site,' then the test paragraphs 4.4.3.2.1 and
4.4.3.2.2 need not be performed.