ARMY UFGS-33 24 13-2008
GROUND-WATER MONITORING WELLS

Standard No.
ARMY UFGS-33 24 13-2008
Release Date
2008
Published By
U.S. Military Regulations and Norms
Scope
1.1 UNIT PRICES Payment for each specified item will be made at the contract unit price for that item. Payment will include full compensation for equipment, materials and labor for drilling; removal and disposal of temporary casing, cuttings, and drill fluid; preparation of borehole logs; and sample handling, containers, storage, and testing. Depth, logging, installation, casing, riser pipe, and well screen shall be measured by linear distance. Payment will not be allowed for test holes or monitoring wells abandoned due to construction practices not in accordance with this specification, or for the convenience of the Contractor. 1.1.1 Test Holes If the total depth of the test hole is greater than that specified in the contract for "Test Holes, and Samples," the additional depth will be paid for at the contract unit price for "Additional Test Hole Depth." If the test hole is developed into the permanent monitoring well, no separate payment will be made for the test hole. 1.1.2 Monitoring Well Drilling and Sampling If the total depth of the monitoring well is greater than that specified in the contract for "Monitoring Wells and Samples," the additional depth will be paid for at the contract unit price for "Additional Monitoring Well Depth." 1.1.3 Geophysical Logging The "Geophysical Logging" unit price will include interpretation of the logs and their delivery to the Government. 1.1.4 Casing/Riser Pipe Selection and Installation Payment will be made for length of blank casing actually installed in the well. Payment will include compensation for decontamination and installation of the casing/riser pipe, cap, tail piece (if any), end cap and centralizers; and for the furnishing and installing of the well identification tag with information recorded thereon, or well marking as per contract. 1.1.5 Monitoring Well Screen Payment will be made for monitoring well screen actually installed in the well. 1.1.6 Filter Pack Construction Filter pack construction will be measured by the cubic meter foot. Payment will include compensation for furnishing, delivering, storage, decontamination, analytical testing, and installing the filter pack. 1.1.7 Bentonite Seal The bentonite seal will be measured by the cubic meter foot. Payment will include full compensation for hydrating, and tremieing necessary for the work. 1.1.8 Grout Placement The cement and/or bentonite grout used in the annulus above the bentonite seal will be paid by the cubic meter foot used. Payment will include compensation for cement, mixing of the grout, and pumping of grout, bentonite, mixing of bentonite grout, and pumping of bentonite grout, necessary for the work. 1.1.9 Monitoring Well Development Payment for monitoring well development will be made by the hour. Payment will include compensation for pumping, surging, bailing, sample photograph, discharge water containers, and disposal.



Copyright ©2024 All Rights Reserved